An engineer crouching on a reinforcement mat on site

7:40 amOn site, no signal

Site inspection reports, from site to signed in minutes

Photos and rough notes on your phone, even with no signal. The wording is drafted for you. You check it, approve it, and get your firm's own Word report.

Demo. Pre-written wording, nothing is sent.

Item 2

2 of 4 in IR.7 Crane base

Offline. 12 photos saved on this phone

Photos

Photo 1 of the excavation corner Photo 2 of the excavation Photo 3 of the excavation

Note for item 2

debris and loose rock in corner of crane base excavation under the cage

How one line gets made

Follow the debris in the corner of this crane base, from the note typed on site to the line your client reads.

3.2 m
Photo of the corner
Photo 1, item 2
  1. 1Your note on site

    debris and loose rock in corner of crane base excavation under the cage

  2. 2Drafted for you

    AI draft, not checked yet

    Debris and loose rock were observed within the corner of the crane base excavation beneath the reinforcement cage. Clean the excavation of all debris and loose material before the pour.

  3. 3You approve

    Signed off

    Both lines checked, edited if needed, and signed. Recommendation: clean the excavation of all debris and loose material before the pour.

Read down the register. Sign off without opening every item.

Every item in the inspection on one screen: observation, recommendation, every photo, and whether it's signed. Nothing is cut off.

An inspection register: four items with their photos and status
No.ItemPhotosStatus
1

Starter bars

Observation Starter bars were in place at the spacing shown on the drawings.

2 photos Signed off
2

Debris in excavation corner

Observation Debris and loose rock were observed within the corner of the crane base excavation beneath the reinforcement cage.

Recommendation Clean the excavation of all debris and loose material before the pour.

3 photos Signed off
3

Bar chairs

Observation Bar chairs were missing under the bottom mat at the north-east corner.

Recommendation Provide bar chairs to keep the specified cover before the pour.

1 photo Edited, not signed
4

Formwork ties

1 photo Not checked

Item 4 had nothing wrong, so it's just the title and the photo. It can still be signed off.

4:20 pmSigned and exported

Five minutes later, it's signed off

You check the wording, approve it, and the report comes out in your firm's own Word template, with the photos and the Regulation 126 certificate.

Inspection report IR.7 Crane baseJob E-1001

The corner of the excavation

Item 2 observation

Debris and loose rock were observed within the corner of the crane base excavation beneath the reinforcement cage.

Recommendation

Clean the excavation of all debris and loose material before the pour.

Signed off by the engineer, 4:20 pm

30 minutes at the desk. Aiming for 5.

Desk time per report. About 30 minutes today, and 5 is the trial's target.

Today30
Trial target5

We'll show the measured number once the trial ends.

Built for how engineers work

  • Works offline, nothing lostPhotos and notes are saved on the phone and sync when there's signal.
  • Your firm's Word templateWord, PDF and a photo zip, in the layout your clients already know.
  • AI drafts, a person approvesNothing leaves the office until an engineer signs it off.
  • Regulation 126 certificatesMade with the report, from the project's details.
  • Photo location data removedEvery photo is cleaned before it's stored.
  • Data kept in AustraliaReports, photos and AI drafting stay onshore.

Try it on your next inspection

Book a trial